Stone Retaining Wall Construction

From site survey to design, from foundation excavation to masonry and drainage, with our own crew and machines. We have built stone walls up to 25 metres high.

What Is a Stone Retaining Wall?

Stone retaining wall is a retaining wall built of natural stone to prevent soil from sliding on sloping land; it has a foundation and drainage behind the wall. In Fatsa and Ordu, Mimaran carries out the work with its own crew and machines, from site survey to design, from stone supply to foundation excavation, masonry and weep hole work. We have built stone walls up to 25 metres high; the stone walls we build carry a 1-year warranty.

Which Stone Wall Suits You?

The wall type is determined by the slope of the land, the height of the soil to be retained and whether both faces of the wall will be visible. We decide together at the site survey.

Single-faced stone retaining wall

Single-Faced Retaining Wall

Classic retaining wall backfilled with soil behind it, with the front face visible. For roadsides, slopes and plot boundaries.

Double-faced stone wall inside a housing site

Double-Faced Stone Wall

Free-standing wall with both faces visible. For site and garden dividers and terraced land.

Stone wall in a villa garden

Garden Wall

Low walls where appearance comes first. With brick or concrete coping options, for villas and detached houses.

How We Do the Work

Coping Stone masonrybattered face Weep holewater outlet Foundation Drainagebackfill Retained soil
Schematic section · not to scale
  1. 01

    Free Site Survey

    In Ordu, Samsun and Giresun we see the land on site and examine the dimensions and the ground.

  2. 02

    Design and Section

    Our own team draws the stone wall design; base width, foundation and stone volume are worked out.

  3. 03

    Foundation Excavation

    With our own excavators we dig down to firm ground.

  4. 04

    Stone Supply and Masonry

    The stone comes from a suitable quarry and is laid with interlocking stones, with a front-face batter matching the design section.

  5. 05

    Drainage and Weep Holes

    Weep pipes are installed as the masonry rises; the back of the wall is filled with crushed-stone drainage backfill, and water drains out through the weep holes.

  6. 06

    Handover and Warranty

    The site is cleaned and the wall is checked together; it is handed over with a 1-year warranty.

Stone Walls We Have Built

Stone retaining wall built for Varlık İnşaat
Varlık İnşaat
High stone retaining wall at the Green Life site
Green Life
Curved stone wall at Lebi Derya Konutları
Lebi Derya Konutları

Frequently Asked Questions

What is the difference between a stone wall and a concrete retaining wall?

A stone wall holds back the soil by its own weight (gravity wall) and drains the water behind it through back drainage and weep holes. A concrete wall is reinforced concrete cast in formwork. Which one is suitable is determined at the site survey according to height and ground.

Is the site survey charged?

The site survey is free in Ordu, Samsun and Giresun.

Do you supply the stone?

Yes, we supply the stone. We work with all the quarries in and around Fatsa and generally bring it from the quarry closest to the project. If you want a particular stone colour, we source it from whichever quarry has that colour. We also operated Ordu Metropolitan Municipality's stone quarry in Ünye between October 2024 and December 2025.

Does the stone wall have a warranty?

Yes, the stone walls we build carry a 1-year warranty.

Is a ground investigation necessary?

We recommend a ground investigation, especially for high walls. Foundation depth and wall section are determined according to the ground; knowing the ground directly affects both safety and cost.

Who draws the design?

Our own team draws the stone wall designs. The tallest stone wall we have built is 25 metres.

Do you build stone walls outside Ordu?

Yes, we work all over Turkey. Outside the province, machinery transport costs are paid by the customer, so it suits jobs large enough to justify the transport.

How long does it take?

The duration depends on the wall length, height and site access; we give it in writing after the site survey.